the project brief

Our client had a very tight schedule and wanted to fast track the project with integrated suppy chains for this prestigious project in order to meet the brief.

the soloution

We provided a one-subcontractor solution, designing, suppling and installing the underfloor heating system along with the screed and insulation. This gave the client a smooth and reliable operation on site meaning deadlines were easily met!

The result

A project that was delivered on time and within budget. We delivered a fully integrated floor build up system from the subfloor base up to the final floor screed, all managed, installed and supervised by WMS.

System

AmbiDuoClip

Architect

Hall Needham Associates Ltd

Meet The Delivery Team

Martin Waite

Project Manager

Fact

Pirates wore eye patches so their vision was already adjusted to the low levels of light below deck.

Favourite Quote

"Our ability to handle life’s challenges is a measure of our strength of character" – Les Brown

Contact Us

This website uses cookies to make the website better. Find out more about cookies.