PROJECT BRIEF

Our client had requested a dry system build-up in order to save on weight and drying times which also had to accommodate a mix of floor finishes from timber to tile and carpet. The riverside development, the tallest residential tower in the area, also need careful logistical consideration.

PROJECT SOLUTION

The system designed suited the client’s requirements exactly, comprising of acoustic rubber, floating floor system and cement board with programmable stats and bathrooms on a separate loop. This eliminated any drying times and is one of our most lightweight systems.

END RESULT

Designed, supplied and installed with our expert wraparound service, the finished result left the client very happy. The development will provide 103 superior one, two and three-bedroom apartments and penthouses, 24 hours a day dedicated concierge, private parking and cycle store.

CLIENT TESTIMONIAL

“Having worked with WMS in Kings Point a development of 103 No apartments at Kings Road I found WMS very accommodating and easy to deal with. Their work and installation was of the highest standards. I would have no hesitation in recommending them or working with Ashley and WMS going forward.”

Henry Construction

CLIENT

Henry Construction

SYSTEM

UNITS

103 over 18 floors

Meet The Delivery Team

Ashley Cooper

Managing Director

FACT

Love spending time with the family. I want those that work with me to enjoy their job and be inspired to achieve whilst making it fun. The average child laughs 300 times a day, adults only 15! Laugh more and live better!

FAVOURITE QUOTE

"Attitude is a little thing that makes a big difference."

Contact Us

Download the WMS Part O Paper

Thank you for requesting our paper on Part O and Underfloor Heating.

Thank you for taking a moment to sign up to the WMS quarterly newsletter. You can keep up-to-date with industry news and developments, as well as company updates such as projects, news stories and more. Just enter your details below.